Due to the construction/remodel of the library, portions of the RES walkway will be closed starting Monday, October 7th, 2024, until December 2024.
The exterior stairway between RES and LIB and the lower Northwest entrance into RES will be closed and barricaded. Foot traffic will be rerouted to the 1st Floor East entrance of RES or the 1st Floor Southwest entrance of LIB.
The walkway South of RES will remain open. There will be times of no active construction or equipment movement when the barricades will be removed and foot traffic allowed.