Phase 1 – Modifications to Existing Sanitary Sewer – 10/14 – 11/18 ? West side of Clifton St. will be closed down to complete sanitary sewer modifications. – Entrances into PCC Lot 1, Parking Garage 4, Loading Dock for RES, and EAD Lot 6 will remain in service during utility work. (utility plates to be installed as required) – Clifton St. will be one lane during Phase 1 with traffic being able to travel north. – Detour signage will be set in place to guide traffic south either down Boland St. or Montgomery St. to Camp Bowie Blvd. to access Clifton St. from the south. Phase 2 – Modifications to Existing Water Service – 11/18 ? 12/19 ? East side of Clifton St. will be closed down to complete water line services upgrades. – Entrances into Lot 2 and Parking Garage 5 will remain in service during utility work. (utility plates to be installed as required) – Clifton St. will be one lane during Phase 2 with traffic being able to travel south. – Detour signage will be set in place to guide traffic north either up Boland St. or Montgomery St. to Camp Bowie Blvd. to access Clifton St. from the north.