As part of the 2nd fl. renovation. The contractor is needing to test the system to verify the system is functioning correct. The pretest will take place Thursday the 25th of January at 630am. The system will be back in normal condition by 7am.
As part of the 2nd fl. renovation. The contractor is needing to test the system to verify the system is functioning correct. The pretest will take place Thursday the 25th of January at 630am. The system will be back in normal condition by 7am.